Context

Wyrd carries two directly opposed retention forces, and the architecture has never said which wins. Crypto-erase (ADR-0021 §4) destroys a key to make data permanently unrecoverable — the right-to-erasure ("delete my data", GDPR Article 17) story. Compliance hold / WORM (proposal 0006, Facet D) requires that held data cannot be deleted until a retention period expires or a legal hold is released, even by the operator (S3 Object Lock, SEC 17a-4). These collide head-on: a KEK destroy defeats a hold, and a legal hold blocks an erasure request. The conflict is not theoretical — litigation-hold-versus-right-to-erasure is a real legal tension that a storage substrate must resolve explicitly and auditably, not by whichever code path happens to run first.

ADR-0026 §1 already gates the mechanism — the KeyService destroy-KEK operation is refused while any object under that KEK is under a hold — but the policy it implements (which force wins, and what happens when the hold lifts) was deferred to this ADR by proposal 0006 §4.

Decision

  1. An active hold is absolute and wins over every deletion force. A legal hold or unexpired compliance-mode retention overrides user delete, lifecycle expiry, trash purge, version pruning, crypto-erase, and a right-to-erasure request. While it holds, the data and the key material that decrypts it (KEK and the relevant DEKs) MUST persist. Governance-mode retention is not absolute: a principal holding the compliance-bypass permission may still erase.

  2. A right-to-erasure request against held data is queued, not refused. It is recorded as pending, the requester and operator are informed that a legal obligation (the hold) blocks it — the lawful basis being GDPR Art. 17(3), where a legal obligation overrides erasure — and on the hold's release or expiry the pending erasure executes automatically. Erasure of held data is thus asynchronous, never silently dropped and never prematurely performed.

  3. The destroy-KEK gate (ADR-0026 §1) is the enforcement point. KeyService refuses KEK/DEK destruction while any object under it is held; when the last hold over a key lifts, queued erasures proceed. The precedence lives at the key-custody boundary, not in the gateway, so it cannot be bypassed below L1.

  4. Erasure precision forces DEK-level granularity. Because a single held object under a per-tenant KEK would otherwise block all erasure under that tenant, satisfying an erasure request for unheld data while held data persists requires destroying at the DEK level (per-object / per-bucket), not the KEK. This makes the key-hierarchy-depth [OPEN] in ADR-0021 a decision this precedence now forces, not an open option.

  5. Every conflict event is audited. An erasure blocked by a hold, its queuing, and its later execution are written to the append-only audit / event log (section 8.3) — the dual proof that satisfies both the WORM auditor and the data-protection regulator.

Hold expiry timing is evaluated against trusted time (ADR-0024), so a skewed or rolled-back clock can neither release a hold early nor trigger a queued erasure prematurely.

Consequences

  • The conflict has a single, legally defensible, auditable answer: a court-ordered hold provably beats a deletion request, and on release the deletion provably runs — neither is lost.
  • Erasure becomes an asynchronous, queued operation for any data that is or may become held; callers MUST treat "erasure accepted" as "scheduled", not "done", when a hold is present.
  • The DEK-level-destruction requirement (point 4) settles the ADR-0021 key-hierarchy [OPEN] toward finer keys, with the cost that the key hierarchy and re-wrap accounting grow per object/bucket.
  • The precedence is verifiable under DST (ADR-0009): a held object survives an erasure request; on hold release the queued erasure executes; a clock rollback does neither early.
  • Refines ADR-0021 and ADR-0026; ratifies the open precedence decision in proposal 0006; depends on ADR-0024 for hold-expiry timing.